Now that the Mackenzie River ice bridge is closed, there may be as much as a three-week wait until the ice breaks to allow ferry service, says Bob Kelly, a spokesman for the Department of Transportation.
Kelly said the ferry crossing usually opens in mid-May.
As for other ice crossings, the Liard River and Ndulee ice bridges closed today (April 19) at 8 a.m. The bridges were reduced to one lane only and were in rough shape with water and slush on the surface.
Highway personnel inspected the crossings daily and invoked the 72-hour notice of closure on Friday.
Mackenzie Highway 1 is in fair condition, but motorists are advised to watch for men who may be working on the highway.